Tuesday, June 21, 2016

Weekly proposals 06/20-06/24

Weekly Team Proposals Date: 06/20 – 06/24
Team Name: Solar
  1. Proposal Narrative (verbal description of what is proposed to be accomplished for the week, include design requirements and deliverables – aka deadlines)
  • Improve the solar panel array design 07/01
  • Power estimation for the test track (number of batteries, panels and their disposition) 06/24
  • Search possible sponsors/manufacturers for the solar panel 07/01
  • Wayside pick up alternatives 06/24
  • Full scale test track parameters 06/24


  1. Sketches / drawings / calculations (Attach presentations, Excel charts, data, Etc)
Solar Panel Array


Block Diagram



Solar Block Diagram
  1. Critical Path Schedule (scheduling project objectives for current week and future weeks, please include end goals)
The priorities for next week are going to be to start the improvement of the solar panel array design and to define the full scale test track parameters.
  1. Budget (look into Value-in-Kind – aka Sponsorships … and cash budget with Bill of Materials)
For now, the team is working only with designs, so there is no equipment needed. However, it would be helpful to have some snacks at the facility, as well as a better Internet connection.
Team Member 1:  Durval
  1. Pertinent Skills: Solidworks, MS Office
  2. Responsibilities: Solar panel array design, search for sponsors/manufacturers
Team Member 2: Leonardo
  1. Pertinent Skills: SAM, MS Office
  2. Responsibilities: power estimation for the test track, Wayside pick up alternatives, Full scale test track parameters
Team Member 3: Eric
  1. Pertinent Skills: SAM, MS Office
  2. Responsibilities: power estimation for the test track, Wayside pick up alternatives, Full scale test track parameters
Team Member 4: Lucas
  1. Pertinent Skills: Solidworks, MS Office
  2. Responsibilities:  Solar panel array design, search for sponsors/manufacturers

No comments:

Post a Comment